A - Z program listing >>

Hometime

EPISODES

OPB

previous

July
Sat, Jul 9, 4:00 pm · Stone Cottage - Vaulted Ceiling
The house gets sheathing for the floors, primer on the walls and a stained-cedar vaulted ceiling. 25 minutes [  TVG ]
Sat, Jul 16, 4:00 pm · Stone Cottage - Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. 25 minutes [  TVG ]
Sat, Jul 23, 4:00 pm · Stone Cottage - Exterior Doors
The custom matching garage and entry doors are made and the floors are leveled for tiling. 26 minutes [  TVG ]
Sat, Jul 30, 4:00 pm · Stone Cottage - Tile
Craftsmen install ceramic and natural stone tile in the bathroom and natural stone on the fireplace. 26 minutes [  TVG ]
August
Sat, Aug 6, 4:00 pm · Stone Cottage - Driveway
The crew installs the paver driveway, as well as the master bathroom cabinets. 25 minutes [  TVG ]
Sat, Aug 13, 4:00 pm · Stone Cottage - Interior Doors
The crew works on the interior doors, kitchen cabinets, wainscoting and exterior columns. 25 minutes [  TVG ]
Sat, Aug 20, 4:00 pm · Stone Cottage - Laundry Room
The crew installs custom cabinets for the laundry room and starts the home's wood flooring. 25 minutes [  TVG ]
Sat, Aug 27, 4:00 pm · Stone Cottage - Office
The home office begins to take shape, as the custom staircase work begins. 25 minutes [  TVG ]
September
Sat, Sep 3, 4:00 pm · Stone Cottage - Countertops
The stone countertops are fabricated and installed. 25 minutes [  TVG ]
Sat, Sep 24, 4:00 pm · Stone Cottage - Sod & Stone
The custom handrail is built, granite countertops are installed and drip irrigation is wrapped up. 25 minutes [ CC TVG ]
October
Sat, Oct 1, 4:00 pm · Closet Organizers
The crew explores the storage options for closets and installs a discrete fireplace screen. 26 minutes [  TVG ]
Sat, Oct 8, 4:00 pm · Wine Cellar
The crew builds a sophisticated wine cellar racking system and installs a climate control unit. 26 minutes [  TVG ]
Sat, Oct 15, 4:00 pm · Side Porch
The crew builds huge decorative wood brackets and gives a new kitchen a test run with a local chef. 26 minutes [  TVG ]
Sat, Oct 22, 4:00 pm · Workshop
The crew devises sophisticated tool storage systems and builds a custom workbench. 26 minutes [  TVG ]
Sat, Oct 29, 4:00 pm · Home Theater
The crew showcases the latest in TV technology and automated controls for entertainment equipment. 26 minutes [  TVG ]
November
Sat, Nov 5, 4:00 pm · Outdoor Kitchen Island
The crew builds an outdoor cooking island and anchors an outdoor lamp post. 26 minutes [  TVG ]
Sat, Nov 12, 4:00 pm · Built-In Grill
The crew sets an outdoor grill into a stone and granite island. 26 minutes [  TVG ]
Sat, Nov 19, 4:00 pm · Mailbox & Flower Box
Design and carpentry tie mailboxes and a flower box to the architectural style of a home. 26 minutes [  TVG ]
Sat, Nov 26, 4:00 pm · Cottage Style Expressions
Full extension drawers are built, snow guards at attached and a home's cottage style is explored. 26 minutes [  TVG ]
December
Sat, Dec 3, 4:00 pm · Microscapes 1
The crew helps two neighbors design and install coordinated landscaping on smaller adjacent lots. 26 minutes [  TVG ]
Sat, Dec 24, 4:00 pm · Microscapes 2
The crew pitches in to help neighbors finish two smaller, coordinated landscapes. 25 minutes [  TVG ]
Sat, Dec 31, 4:00 pm · Porch And Rail
A plain vanilla covered porch gets upgraded with hardwood decking and a PVC railing system. 26 minutes [  TVG ]
January
Sat, Jan 7, 4:00 pm · Circular Beds
A front yard is redesigned with a circle theme in the planting beds, the patios and the driveway. 26 minutes [  TVG ]
Sat, Jan 14, 4:00 pm · Exterior Harmony: Windows
Explores the blending of exterior elements in new home constructions with a focus on windows. 26 minutes [  TVG ]
Sat, Jan 21, 4:00 pm · Exterior Harmony: Roofing
The crew frames a new landscape bridge and covers the home's roof with copper and synthetic slate. 26 minutes [  TVG ]
Sat, Jan 28, 4:00 pm · Exterior Harmony: Siding
The new landscape bridge is ready steps. The home gets siding, soffits, fascia and trim. 26 minutes [  TVG ]
February
Sat, Feb 4, 4:00 pm · Exterior Harmony: Doors And Stone
The new home's architecture is enhanced with continuity of garage doors, entry doors and shutters. 26 minutes [  TVG ]

upcoming

February
Sat, Feb 11, 4:00 pm · Exterior Harmony: Driveway And Walkway
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer. 26 minutes [  TVG ]
Sat, Feb 18, 4:00 pm · Microscapes 1
The crew helps two neighbors design and install coordinated landscaping on smaller adjacent lots. 25 minutes [  TVG ]
Sat, Feb 25, 4:00 pm · Microscapes 2
The crew pitches in to help neighbors finish two smaller, coordinated landscapes. 25 minutes [  TVG ]
March
Sat, Mar 3, 4:00 pm · Kitchen & Mud Room Remodel 1
The crew updates the 1970s remodel of a 1911 kitchen with new windows and a new patio door. 26 minutes [  TVG ]
Sat, Mar 24, 4:00 pm · Kitchen & Mud Room Remodel 4
Dean and Miriam show how to blend two different finishes as they install new cabinets. 26 minutes [  TVG ]

more

March
Sat, Mar 31, 4:00 pm · Kitchen & Mud Room Remodel 5
The crew gets the kitchen, mud room and powder room areas ready for new flooring and countertops. 26 minutes [  TVG ]
OPB Plus

previous

June
Mon, Jun 21, 8:00 am · Caretaker's Home
The crew restores the porch of what was once the caretaker's home on a 40-acre lakeside estate. 25 minutes [ CC TVG ]
Mon, Jun 21, 2:00 pm · Caretaker's Home
The crew restores the porch of what was once the caretaker's home on a 40-acre lakeside estate. 25 minutes [ CC TVG ]
Fri, Jun 25, 8:00 am · Entrance Plaza
A church courtyard is renovated with a concrete walkway, wood benches and a raised planting bed. 25 minutes [ CC TVG ]
Fri, Jun 25, 2:00 pm · Entrance Plaza
A church courtyard is renovated with a concrete walkway, wood benches and a raised planting bed. 25 minutes [ CC TVG ]
Mon, Jun 28, 8:00 am · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
Mon, Jun 28, 2:00 pm · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
July
Fri, Jul 2, 8:00 am · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
Fri, Jul 2, 2:00 pm · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
Mon, Jul 5, 8:00 am · Eat-In Kitchen: Cabinets
The crew installs new kitchen cabinets, a new sliding door and new floor tile. 25 minutes [ CC TVG ]
Mon, Jul 5, 2:00 pm · Eat-In Kitchen: Cabinets
The crew installs new kitchen cabinets, a new sliding door and new floor tile. 25 minutes [ CC TVG ]
Fri, Jul 9, 8:00 am · Eat-In Kitchen: Wrap Up
The crew installs countertops and appliances and a new wood floor for the adjacent living room. 25 minutes [ CC TVG ]
Fri, Jul 9, 2:00 pm · Eat-In Kitchen: Wrap Up
The crew installs countertops and appliances and a new wood floor for the adjacent living room. 25 minutes [ CC TVG ]
Mon, Jul 12, 8:00 am · Sculpture Studio: Framing
A garage is converted into a metal-working studio with a new heater and a downsized garage door. 25 minutes [ CC TVG ]
Mon, Jul 12, 2:00 pm · Sculpture Studio: Framing
A garage is converted into a metal-working studio with a new heater and a downsized garage door. 25 minutes [ CC TVG ]
Fri, Jul 16, 8:00 am · Sculpture Studio: Finishing
The crew wraps up the workshop with doors, windows and welding equipment. 25 minutes [ CC TVG ]
Fri, Jul 16, 2:00 pm · Sculpture Studio: Finishing
The crew wraps up the workshop with doors, windows and welding equipment. 25 minutes [ CC TVG ]
Mon, Jul 19, 8:00 am · Great Room Hardwood Floor
The crew installs a super-hard prefinished wood floor. 25 minutes [ CC TVG ]
Mon, Jul 19, 2:00 pm · Great Room Hardwood Floor
The crew installs a super-hard prefinished wood floor. 25 minutes [ CC TVG ]
Fri, Jul 23, 8:00 am · Travertine Floor
The crew installs large-format limestone flooring. 25 minutes [ CC TVG ]
Fri, Jul 23, 2:00 pm · Travertine Floor
The crew installs large-format limestone flooring. 25 minutes [ CC TVG ]
Mon, Jul 26, 8:00 am · Seven-Year Plan
The crew works with a designer on a house-wide makeover and tears apart the living and dining rooms. 25 minutes [ CC TVG ]
Mon, Jul 26, 2:00 pm · Seven-Year Plan
The crew works with a designer on a house-wide makeover and tears apart the living and dining rooms. 25 minutes [ CC TVG ]
Fri, Jul 30, 8:00 am · Kitchen Facelift
The crew transforms a kitchen with re-faced cabinets, new counters, tile, appliances and lighting. 25 minutes [ CC TVG ]
Fri, Jul 30, 2:00 pm · Kitchen Facelift
The crew transforms a kitchen with re-faced cabinets, new counters, tile, appliances and lighting. 25 minutes [ CC TVG ]
Sat, Jul 31, 6:30 am · Party Kitchen
The crew installs doors, tile and cabinets for the basement wet bar and peninsula. 25 minutes [ CC TVG ]
Sat, Jul 31, 8:30 am · Kitchen Facelift
The crew transforms a kitchen with re-faced cabinets, new counters, tile, appliances and lighting. 25 minutes [ CC TVG ]
Sat, Jul 31, 9:30 am · Cabin Kitchen Upgrade
The crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures. 25 minutes [ CC TVG ]
Sat, Jul 31, 12:30 pm · Party Kitchen
The crew installs doors, tile and cabinets for the basement wet bar and peninsula. 25 minutes [ CC TVG ]
Sat, Jul 31, 2:30 pm · Kitchen Facelift
The crew transforms a kitchen with re-faced cabinets, new counters, tile, appliances and lighting. 25 minutes [ CC TVG ]
Sat, Jul 31, 3:30 pm · Cabin Kitchen Upgrade
The crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures. 25 minutes [ CC TVG ]
August
Mon, Aug 2, 8:00 am · Great Room Update
New trim, wood flooring, lighting, paint and furniture transform a dated 1970s living room. 25 minutes [ CC TVG ]
Mon, Aug 2, 2:00 pm · Great Room Update
New trim, wood flooring, lighting, paint and furniture transform a dated 1970s living room. 25 minutes [ CC TVG ]
Fri, Aug 6, 8:00 am · Linoleum Flooring
The crew installs sheet and tile linoleum on the log cabin basement floor. 25 minutes [ CC TVG ]
Fri, Aug 6, 2:00 pm · Linoleum Flooring
The crew installs sheet and tile linoleum on the log cabin basement floor. 25 minutes [ CC TVG ]
Mon, Aug 9, 8:00 am · Cabin Kitchen Upgrade
The crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures. 25 minutes [ CC TVG ]
Mon, Aug 9, 2:00 pm · Cabin Kitchen Upgrade
The crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures. 25 minutes [ CC TVG ]
Fri, Aug 13, 8:00 am · Vacation Home Laundry Room
The crew adds new cabinets and plumbing fixtures to a log cabin lower level. 25 minutes [ CC TVG ]
Fri, Aug 13, 2:00 pm · Vacation Home Laundry Room
The crew adds new cabinets and plumbing fixtures to a log cabin lower level. 25 minutes [ CC TVG ]
Mon, Aug 16, 8:00 am · Historic Summer Home - Structural Upgrades
The crew removes cabinets, reinforce sagging walls and pour a new concrete kitchen floor. 25 minutes [ CC TVG ]
Mon, Aug 16, 2:00 pm · Historic Summer Home - Structural Upgrades
The crew removes cabinets, reinforce sagging walls and pour a new concrete kitchen floor. 25 minutes [ CC TVG ]
Fri, Aug 20, 8:00 am · Historic Summer Home - Kitchen
The crew rebuilds cabinets and installs historically sensitive countertops, flooring and fixtures. 25 minutes [ CC TVG ]
Fri, Aug 20, 2:00 pm · Historic Summer Home - Kitchen
The crew rebuilds cabinets and installs historically sensitive countertops, flooring and fixtures. 25 minutes [ CC TVG ]
Mon, Aug 23, 8:00 am · Barrel Vault Basement
Cracks are repaired, an arched ceiling is made and doors and windows are fixed in a bland basement. 25 minutes [ CC TVG ]
Mon, Aug 23, 2:00 pm · Barrel Vault Basement
Cracks are repaired, an arched ceiling is made and doors and windows are fixed in a bland basement. 25 minutes [ CC TVG ]
Fri, Aug 27, 8:00 am · Party Kitchen
The crew installs doors, tile and cabinets for the basement wet bar and peninsula. 25 minutes [ CC TVG ]
Fri, Aug 27, 2:00 pm · Party Kitchen
The crew installs doors, tile and cabinets for the basement wet bar and peninsula. 25 minutes [ CC TVG ]
Mon, Aug 30, 8:00 am · Arched Wood Panels
Granite countertops and a shower door are installed. Wood paneling is wrapped up around a fireplace. 25 minutes [ CC TVG ]
Mon, Aug 30, 2:00 pm · Arched Wood Panels
Granite countertops and a shower door are installed. Wood paneling is wrapped up around a fireplace. 25 minutes [ CC TVG ]
September
Fri, Sep 3, 8:00 am · Attic Trusses
The crew shores up the block walls and uses attic trusses to create a room over a detached garage. 25 minutes [ CC TVG ]
Fri, Sep 3, 2:00 pm · Attic Trusses
The crew shores up the block walls and uses attic trusses to create a room over a detached garage. 25 minutes [ CC TVG ]
Mon, Sep 6, 8:00 am · Standalone Garage
The crew seals up the exterior of the garage and the new studio that has been built above it. 25 minutes [ CC TVG ]
Mon, Sep 6, 2:00 pm · Standalone Garage
The crew seals up the exterior of the garage and the new studio that has been built above it. 25 minutes [ CC TVG ]
Fri, Sep 10, 8:00 am · Yoga Studio
The upstairs studio gets paint, flooring and lighting and the garage gets flooring and cabinets. 25 minutes [ CC TVG ]
Fri, Sep 10, 2:00 pm · Yoga Studio
The upstairs studio gets paint, flooring and lighting and the garage gets flooring and cabinets. 25 minutes [ CC TVG ]
Sat, Sep 11, 9:30 am · Stone Cottage - Insulation
The crew installs cables for lighting control, audio, video and security and helps with insulation. 25 minutes [ CC TVG ]
Sat, Sep 11, 11:00 am · Stone Cottage - Geothermal
The crew installs the radiant floor heating system and the geothermal heating and cooling equipment. 25 minutes [ CC TVG ]
Sat, Sep 11, 3:30 pm · Stone Cottage - Insulation
The crew installs cables for lighting control, audio, video and security and helps with insulation. 25 minutes [ CC TVG ]
Sat, Sep 11, 5:00 pm · Stone Cottage - Geothermal
The crew installs the radiant floor heating system and the geothermal heating and cooling equipment. 25 minutes [ CC TVG ]
Mon, Sep 13, 8:00 am · Digging Out The Yard
The crew re-grades a sloping yard, installs a drainage system and builds a series of paver patios. 26 minutes [ CC TVG ]
Mon, Sep 13, 2:00 pm · Digging Out The Yard
The crew re-grades a sloping yard, installs a drainage system and builds a series of paver patios. 26 minutes [ CC TVG ]
Fri, Sep 17, 8:00 am · Urban Terraces
The crew weaves several retaining walls, steps and patios into a small back yard. 26 minutes [ CC TVG ]
Fri, Sep 17, 2:00 pm · Urban Terraces
The crew weaves several retaining walls, steps and patios into a small back yard. 26 minutes [ CC TVG ]
Mon, Sep 20, 8:00 am · Caretaker's Home
The crew restores the porch of what was once the caretaker's home on a 40-acre lakeside estate. 25 minutes [ CC TVG ]
Mon, Sep 20, 2:00 pm · Caretaker's Home
The crew restores the porch of what was once the caretaker's home on a 40-acre lakeside estate. 25 minutes [ CC TVG ]
Fri, Sep 24, 8:00 am · Entrance Plaza
A church courtyard is renovated with a concrete walkway, wood benches and a raised planting bed. 25 minutes [ CC TVG ]
Fri, Sep 24, 2:00 pm · Entrance Plaza
A church courtyard is renovated with a concrete walkway, wood benches and a raised planting bed. 25 minutes [ CC TVG ]
Mon, Sep 27, 8:00 am · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
Mon, Sep 27, 2:00 pm · Eat-In Kitchen: Demolition
The crew takes a small kitchen and starts work to improve storage and functionality. 25 minutes [ CC TVG ]
March
Mon, Mar 28, 8:00 am · His And Her Garage
The crew wraps up a second-floor yoga studio for "her" and a garage-level workshop for "him." 25 minutes [ CC TVG ]
Mon, Mar 28, 2:00 pm · His And Her Garage
The crew wraps up a second-floor yoga studio for "her" and a garage-level workshop for "him." 25 minutes [ CC TVG ]
April
Fri, Apr 1, 8:00 am · Stone Cottage - Interior Walls
The crew installs four different types of wall board for the interior walls and ceilings. 25 minutes [ CC TVG ]
Fri, Apr 1, 2:00 pm · Stone Cottage - Interior Walls
The crew installs four different types of wall board for the interior walls and ceilings. 25 minutes [ CC TVG ]
Mon, Apr 4, 8:00 am · Stone Cottage - Vaulted Ceiling
The house gets sheathing for the floors, primer on the walls and a stained-cedar vaulted ceiling. 25 minutes [ CC TVG ]
Mon, Apr 4, 2:00 pm · Stone Cottage - Vaulted Ceiling
The house gets sheathing for the floors, primer on the walls and a stained-cedar vaulted ceiling. 25 minutes [ CC TVG ]
Fri, Apr 8, 8:00 am · Stone Cottage - Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. 25 minutes [ CC TVG ]
Fri, Apr 8, 2:00 pm · Stone Cottage - Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. 25 minutes [ CC TVG ]
Mon, Apr 11, 8:00 am · Stone Cottage - Exterior Doors
The custom matching garage and entry doors are made and the floors are leveled for tiling. 26 minutes [ CC TVG ]
Mon, Apr 11, 2:00 pm · Stone Cottage - Exterior Doors
The custom matching garage and entry doors are made and the floors are leveled for tiling. 26 minutes [ CC TVG ]
Fri, Apr 15, 8:00 am · Stone Cottage - Tile
Craftsmen install ceramic and natural stone tile in the bathroom and natural stone on the fireplace. 25 minutes [ CC TVG ]
Fri, Apr 15, 2:00 pm · Stone Cottage - Tile
Craftsmen install ceramic and natural stone tile in the bathroom and natural stone on the fireplace. 25 minutes [ CC TVG ]
Mon, Apr 18, 8:00 am · Stone Cottage - Driveway
The crew installs the paver driveway, as well as the master bathroom cabinets. 25 minutes [ CC TVG ]
Mon, Apr 18, 2:00 pm · Stone Cottage - Driveway
The crew installs the paver driveway, as well as the master bathroom cabinets. 25 minutes [ CC TVG ]
Fri, Apr 22, 8:00 am · Stone Cottage - Interior Doors
The crew works on the interior doors, kitchen cabinets, wainscoting and exterior columns. 25 minutes [ CC TVG ]
Fri, Apr 22, 2:00 pm · Stone Cottage - Interior Doors
The crew works on the interior doors, kitchen cabinets, wainscoting and exterior columns. 25 minutes [ CC TVG ]
Mon, Apr 25, 8:00 am · Stone Cottage - Laundry Room
The crew installs custom cabinets for the laundry room and starts the home's wood flooring. 25 minutes [ CC TVG ]
Mon, Apr 25, 2:00 pm · Stone Cottage - Laundry Room
The crew installs custom cabinets for the laundry room and starts the home's wood flooring. 25 minutes [ CC TVG ]
Fri, Apr 29, 8:00 am · Stone Cottage - Office
The home office begins to take shape, as the custom staircase work begins. 25 minutes [ CC TVG ]
Fri, Apr 29, 2:00 pm · Stone Cottage - Office
The home office begins to take shape, as the custom staircase work begins. 25 minutes [ CC TVG ]
May
Mon, May 2, 8:00 am · Stone Cottage - Countertops
The stone countertops are fabricated and installed. 25 minutes [ CC TVG ]
Mon, May 2, 2:00 pm · Stone Cottage - Countertops
The stone countertops are fabricated and installed. 25 minutes [ CC TVG ]
Fri, May 6, 8:00 am · Stone Cottage - Fixtures & Appliances
The crew installs bathroom fixtures and appliances for the kitchen and laundry. 25 minutes [ CC TVG ]
Fri, May 6, 2:00 pm · Stone Cottage - Fixtures & Appliances
The crew installs bathroom fixtures and appliances for the kitchen and laundry. 25 minutes [ CC TVG ]
Mon, May 9, 8:00 am · Stone Cottage - Retractable Screens
The covered porch gets motorized screens and the garage floor gets an epoxy coating. 25 minutes [ CC TVG ]
Mon, May 9, 2:00 pm · Stone Cottage - Retractable Screens
The covered porch gets motorized screens and the garage floor gets an epoxy coating. 25 minutes [ CC TVG ]
Fri, May 13, 8:00 am · Stone Cottage - Sod & Stone
The custom handrail is built, granite countertops are installed and drip irrigation is wrapped up. 25 minutes [ CC TVG ]
Fri, May 13, 2:00 pm · Stone Cottage - Sod & Stone
The custom handrail is built, granite countertops are installed and drip irrigation is wrapped up. 25 minutes [ CC TVG ]
Mon, May 16, 8:00 am · His And Her Garage
The crew wraps up a second-floor yoga studio for "her" and a garage-level workshop for "him." 25 minutes [ CC TVG ]
Mon, May 16, 2:00 pm · His And Her Garage
The crew wraps up a second-floor yoga studio for "her" and a garage-level workshop for "him." 25 minutes [ CC TVG ]
Fri, May 20, 8:00 am · Stone Cottage - Interior Walls
The crew installs four different types of wall board for the interior walls and ceilings. 25 minutes [ CC TVG ]
Fri, May 20, 2:00 pm · Stone Cottage - Interior Walls
The crew installs four different types of wall board for the interior walls and ceilings. 25 minutes [ CC TVG ]
Mon, May 23, 8:00 am · Stone Cottage - Vaulted Ceiling
The house gets sheathing for the floors, primer on the walls and a stained-cedar vaulted ceiling. 25 minutes [ CC TVG ]
Mon, May 23, 2:00 pm · Stone Cottage - Vaulted Ceiling
The house gets sheathing for the floors, primer on the walls and a stained-cedar vaulted ceiling. 25 minutes [ CC TVG ]
Fri, May 27, 8:00 am · Stone Cottage - Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. 25 minutes [ CC TVG ]
Fri, May 27, 2:00 pm · Stone Cottage - Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. 25 minutes [ CC TVG ]
Mon, May 30, 8:00 am · Stone Cottage - Exterior Doors
The custom matching garage and entry doors are made and the floors are leveled for tiling. 26 minutes [ CC TVG ]
Mon, May 30, 2:00 pm · Stone Cottage - Exterior Doors
The custom matching garage and entry doors are made and the floors are leveled for tiling. 26 minutes [ CC TVG ]
June
Fri, Jun 3, 8:00 am · Stone Cottage - Tile
Craftsmen install ceramic and natural stone tile in the bathroom and natural stone on the fireplace. 25 minutes [ CC TVG ]
Fri, Jun 3, 2:00 pm · Stone Cottage - Tile
Craftsmen install ceramic and natural stone tile in the bathroom and natural stone on the fireplace. 25 minutes [ CC TVG ]
Mon, Jun 6, 8:00 am · Stone Cottage - Driveway
The crew installs the paver driveway, as well as the master bathroom cabinets. 25 minutes [ CC TVG ]
Mon, Jun 6, 2:00 pm · Stone Cottage - Driveway
The crew installs the paver driveway, as well as the master bathroom cabinets. 25 minutes [ CC TVG ]
Fri, Jun 10, 8:00 am · Stone Cottage - Interior Doors
The crew works on the interior doors, kitchen cabinets, wainscoting and exterior columns. 25 minutes [ CC TVG ]
Fri, Jun 10, 2:00 pm · Stone Cottage - Interior Doors
The crew works on the interior doors, kitchen cabinets, wainscoting and exterior columns. 25 minutes [ CC TVG ]
Mon, Jun 13, 8:00 am · Stone Cottage - Laundry Room
The crew installs custom cabinets for the laundry room and starts the home's wood flooring. 25 minutes [ CC TVG ]
Mon, Jun 13, 2:00 pm · Stone Cottage - Laundry Room
The crew installs custom cabinets for the laundry room and starts the home's wood flooring. 25 minutes [ CC TVG ]
Fri, Jun 17, 8:00 am · Stone Cottage - Office
The home office begins to take shape, as the custom staircase work begins. 25 minutes [ CC TVG ]
Fri, Jun 17, 2:00 pm · Stone Cottage - Office
The home office begins to take shape, as the custom staircase work begins. 25 minutes [ CC TVG ]
Mon, Jun 20, 8:00 am · Stone Cottage - Countertops
The stone countertops are fabricated and installed. 25 minutes [ CC TVG ]
Mon, Jun 20, 2:00 pm · Stone Cottage - Countertops
The stone countertops are fabricated and installed. 25 minutes [ CC TVG ]
Fri, Jun 24, 8:00 am · Stone Cottage - Fixtures & Appliances
The crew installs bathroom fixtures and appliances for the kitchen and laundry. 25 minutes [ CC TVG ]
Fri, Jun 24, 2:00 pm · Stone Cottage - Fixtures & Appliances
The crew installs bathroom fixtures and appliances for the kitchen and laundry. 25 minutes [ CC TVG ]
Mon, Jun 27, 8:00 am · Stone Cottage - Retractable Screens
The covered porch gets motorized screens and the garage floor gets an epoxy coating. 25 minutes [ CC TVG ]
Mon, Jun 27, 2:00 pm · Stone Cottage - Retractable Screens
The covered porch gets motorized screens and the garage floor gets an epoxy coating. 25 minutes [ CC TVG ]
July
Fri, Jul 1, 8:00 am · Stone Cottage - Sod & Stone
The custom handrail is built, granite countertops are installed and drip irrigation is wrapped up. 25 minutes [ CC TVG ]
Fri, Jul 1, 2:00 pm · Stone Cottage - Sod & Stone
The custom handrail is built, granite countertops are installed and drip irrigation is wrapped up. 25 minutes [ CC TVG ]

Note: Only episodes available from 60 days in the past to 60 days in the future are displayed.

Digital Television Help
TONIGHT'S HIGHLIGHTS:

8:00pm Oregon Art Beat
OPB
Paula Fong’s scientific background comes in handy for her art – she loves to paint botanicals and other scenes from nature.

8:30pm Oregon Field Guide
OPB
Field Guide journeys back to the remote, Chetco River almost 10 years after the massive Biscuit fire engulfed the remarkable wilderness river canyon.

9:00pm Doc Martin
OPB : Nowt So Queer
Portwenn is buzzing with the news of the engagement of Dr. Martin and Headmistress Louisa Glasson.

9:46pm Doc Martin
OPB : Happily Ever After
Martin has the dilemma of finding a replacement vicar three hours before his wedding to Louisa.

STATION NEWS:

Become a sponsor