A - Z program listing >>

The This Old House Hour

EPISODES

OPB

previous

October
Fri, Oct 1, 2:00 am · Roxbury Project, Part 9 Of 10/Repairing Newel
Meshed white subway tiles for the kitchen backsplash and a newel post for the stairs are installed. 56 minutes [ Stereo TVG ]
Thu, Oct 7, 12:00 pm · Roxbury Project, Part 10 Of 10/Replacing Outdoor
The final tree is planted in the front yard and the entry gate on the perimeter fence is installed 56 minutes [ Stereo TVG ]
Fri, Oct 8, 2:00 am · Roxbury Project, Part 10 Of 10/Replacing Outdoor
The final tree is planted in the front yard and the entry gate on the perimeter fence is installed 56 minutes [ Stereo TVG ]
Thu, Oct 14, 12:00 pm · Auburndale Project, Part 1 Of 16/Connecting Water
Work begins on giving a 1940s house on Boston's famous Charles River a curb-appeal makeover. 56 minutes [ Stereo TVG ]
Fri, Oct 15, 2:00 am · Auburndale Project, Part 1 Of 16/Connecting Water
Work begins on giving a 1940s house on Boston's famous Charles River a curb-appeal makeover. 56 minutes [ Stereo TVG ]
Thu, Oct 21, 12:00 pm · Auburndale Project, Part 2 Of 16/Installing Balust
Prep work begins on the new foundation of the entry hall and outback the sun porch is demolished. 56 minutes [ Stereo TVG ]
Fri, Oct 22, 2:00 am · Auburndale Project, Part 2 Of 16/Installing Balust
Prep work begins on the new foundation of the entry hall and outback the sun porch is demolished. 56 minutes [ Stereo TVG ]
Thu, Oct 28, 12:00 pm · Auburndale Project, Part 3 Of 16/Creating Storage
A steel beam will carry the load of the house over a 16-foot opening in the rear foundation wall. 56 minutes [ Stereo TVG ]
Fri, Oct 29, 2:00 am · Auburndale Project, Part 3 Of 16/Creating Storage
A steel beam will carry the load of the house over a 16-foot opening in the rear foundation wall. 56 minutes [ Stereo TVG ]
November
Thu, Nov 4, 12:00 pm · Auburndale Project, Part 4 Of 16/Repairing Rotted
The new walls are framed for the mudroom and powder room. A pest control expert addresses termites. 56 minutes [ Stereo TVG ]
Fri, Nov 5, 2:00 am · This Old House Hour
The front entry and framed up kitchen are shown. Prefabricated trusses help make a pitched roof. 56 minutes [ Stereo TVG ]
Thu, Nov 11, 12:00 pm · This Old House Hour
The front entry and framed up kitchen are shown. Prefabricated trusses help make a pitched roof. 56 minutes [ Stereo TVG ]
Fri, Nov 12, 2:00 am · This Old House Hour
The flat roof is framed over the new sunroom and progress is made on the rough plumbing. 56 minutes [ Stereo TVG ]
Thu, Nov 18, 12:00 pm · This Old House Hour
The flat roof is framed over the new sunroom and progress is made on the rough plumbing. 56 minutes [ Stereo TVG ]
Fri, Nov 19, 2:00 am · This Old House Hour
A concrete pump truck pours concrete on the basement level including the footings for the new deck. 56 minutes [ Stereo TVG ]
Thu, Nov 25, 12:00 pm · This Old House Hour
A concrete pump truck pours concrete on the basement level including the footings for the new deck. 56 minutes [ Stereo TVG ]
Fri, Nov 26, 2:00 am · This Old House Hour
The ductwork for the hydronic heating and cooling system is installed in the family room ceiling. 56 minutes [ Stereo TVG ]
December
Thu, Dec 2, 12:00 pm · This Old House Hour
The ductwork for the hydronic heating and cooling system is installed in the family room ceiling. 56 minutes [ Stereo TVG ]
Fri, Dec 3, 2:00 am · This Old House Hour
Chris Kimball of America's Test Kitchen gives his opinion on the final layout of the kitchen design. 56 minutes [ Stereo TVG ]
Thu, Dec 9, 12:00 pm · This Old House Hour
Chris Kimball of America's Test Kitchen gives his opinion on the final layout of the kitchen design. 56 minutes [ Stereo TVG ]
Fri, Dec 10, 2:00 am · This Old House Hour
Arborist Matt Foti removes the Norway maple from the front yard. Kevin takes a Duck Tour in Boston. 56 minutes [ Stereo TVG ]
Thu, Dec 16, 12:00 pm · This Old House Hour
Arborist Matt Foti removes the Norway maple from the front yard. Kevin takes a Duck Tour in Boston. 56 minutes [ Stereo TVG ]
Fri, Dec 17, 2:00 am · This Old House Hour
The footings for the pergola are set. The concrete stoop gets a makeover using fieldstone veneer. 56 minutes [ Stereo TVG ]
Thu, Dec 23, 12:00 pm · This Old House Hour
The footings for the pergola are set. The concrete stoop gets a makeover using fieldstone veneer. 56 minutes [ Stereo TVG ]
Fri, Dec 24, 2:00 am · This Old House Hour
The transformation of the back of the house is almost complete and inside, the painting is underway. 56 minutes [ Stereo TVG ]
Thu, Dec 30, 12:00 pm · This Old House Hour
The transformation of the back of the house is almost complete and inside, the painting is underway. 56 minutes [ Stereo TVG ]
Fri, Dec 31, 2:00 am · This Old House Hour
Rustic Pennsylvania fieldstone for the entry walkway and the kitchen island are spotlighted. 56 minutes [ Stereo TVG ]
January
Thu, Jan 6, 12:00 pm · This Old House Hour
Rustic Pennsylvania fieldstone for the entry walkway and the kitchen island are spotlighted. 56 minutes [ Stereo TVG ]
Fri, Jan 7, 2:00 am · This Old House Hour
The new pergola is installed in front of the house and a 12-foot tall river birch tree arrives. 56 minutes [ Stereo TVG ]
Thu, Jan 13, 12:00 pm · This Old House Hour
The new pergola is installed in front of the house and a 12-foot tall river birch tree arrives. 56 minutes [ Stereo TVG ]
Fri, Jan 14, 2:00 am · This Old House Hour
The wood island top, "his & hers" closet systems and wireless security system are installed. 56 minutes [ Stereo TVG ]
Thu, Jan 20, 12:00 pm · This Old House Hour
The wood island top, "his & hers" closet systems and wireless security system are installed. 56 minutes [ Stereo TVG ]
Fri, Jan 21, 2:00 am · This Old House Hour
The exterior low-voltage lighting and the water-saving plumbing fixtures and bath fan are featured. 56 minutes [ Stereo TVG ]
Thu, Jan 27, 12:00 pm · This Old House Hour
The exterior low-voltage lighting and the water-saving plumbing fixtures and bath fan are featured. 56 minutes [ Stereo TVG ]
Fri, Jan 28, 2:00 am · This Old House Hour
A 1933 Spanish Colonial Revival house is expanded and renovated in the Los Angeles area. 56 minutes [ Stereo TVG ]
February
Thu, Feb 3, 12:00 pm · This Old House Hour
A 1933 Spanish Colonial Revival house is expanded and renovated in the Los Angeles area. 56 minutes [ Stereo TVG ]
Fri, Feb 4, 2:00 am · This Old House Hour
A massive foundation form for the new addition is set. Kevin and Norm visit a major movie studio. 56 minutes [ Stereo TVG ]
Thu, Feb 10, 12:00 pm · This Old House Hour
A massive foundation form for the new addition is set. Kevin and Norm visit a major movie studio. 56 minutes [ Stereo TVG ]
Fri, Feb 11, 2:00 am · This Old House Hour
The new clay roof tiles and the historic looking custom windows and doors arrive on the site. 56 minutes [ Stereo TVG ]
Thu, Feb 17, 12:00 pm · This Old House Hour
The new clay roof tiles and the historic looking custom windows and doors arrive on the site. 56 minutes [ Stereo TVG ]
Fri, Feb 18, 2:00 am · This Old House Hour
56 minutes [ Stereo TVG ]
Thu, Feb 24, 12:00 pm · This Old House Hour
56 minutes [ Stereo TVG ]
Fri, Feb 25, 2:00 am · This Old House Hour
Custom foam forms are installed to make a tray ceiling that replicates the house's existing detail. 56 minutes [ Stereo TVG ]
March
Thu, Mar 3, 12:00 pm · This Old House Hour
Custom foam forms are installed to make a tray ceiling that replicates the house's existing detail. 56 minutes [ Stereo TVG ]
Fri, Mar 4, 2:00 am · This Old House Hour
Custom foam forms are installed to make a tray ceiling that replicates the house's existing detail. 56 minutes [ Stereo TVG ]
Thu, Mar 10, 12:00 pm · This Old House Hour
The last steps of the stucco system go up. Black and yellow tile are installed in the powder room. 56 minutes [ Stereo TVG ]
Fri, Mar 11, 2:00 am · This Old House Hour
The last steps of the stucco system go up. Black and yellow tile are installed in the powder room. 56 minutes [ Stereo TVG ]
Thu, Mar 17, 12:00 pm · This Old House Hour
The new terrace is constructed and the crew adds prefabricated decorative corbels made from foam. 56 minutes [ Stereo TVG ]
Fri, Mar 18, 2:00 am · This Old House Hour
The new terrace is constructed and the crew adds prefabricated decorative corbels made from foam. 56 minutes [ Stereo TVG ]
Thu, Mar 24, 12:00 pm · This Old House Hour
The kitchen cabinets are wrapped in plaster, a look seen in Mexico. The pedestal sink is installed. 56 minutes [ Stereo TVG ]
Fri, Mar 25, 2:00 am · This Old House Hour
The kitchen cabinets are wrapped in plaster, a look seen in Mexico. The pedestal sink is installed. 56 minutes [ Stereo TVG ]
Thu, Mar 31, 12:00 pm · This Old House Hour
Broken concrete is used for the walkways. A custom garage door and the front gates are installed. 56 minutes [ Stereo TVG ]
April
Fri, Apr 1, 2:00 am · This Old House Hour
Broken concrete is used for the walkways. A custom garage door and the front gates are installed. 56 minutes [ Stereo TVG ]
Thu, Apr 7, 12:00 pm · This Old House Hour
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 56 minutes [ Stereo TVG ]
Fri, Apr 8, 2:00 am · This Old House Hour
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 56 minutes [ Stereo TVG ]
Thu, Apr 14, 12:00 pm · Auburndale Project, Part 1 Of 16/Connecting Water
Work begins on giving a 1940s house on Boston's famous Charles River a curb-appeal makeover. 54 minutes [ Stereo TVG ]
Fri, Apr 15, 2:00 am · Auburndale Project, Part 1 Of 16/Connecting Water
Work begins on giving a 1940s house on Boston's famous Charles River a curb-appeal makeover. 54 minutes [ Stereo TVG ]
Thu, Apr 21, 12:00 pm · Auburndale Project, Part 2 Of 16/Installing Balust
Prep work begins on the new foundation of the entry hall and outback the sun porch is demolished. 54 minutes [ Stereo TVG ]
Fri, Apr 22, 2:00 am · Auburndale Project, Part 2 Of 16/Installing Balust
Prep work begins on the new foundation of the entry hall and outback the sun porch is demolished. 54 minutes [ Stereo TVG ]
Thu, Apr 28, 12:00 pm · Auburndale Project, Part 3 Of 16/Creating Storage
A steel beam will carry the load of the house over a 16-foot opening in the rear foundation wall. 54 minutes [ Stereo TVG ]
Fri, Apr 29, 2:00 am · Auburndale Project, Part 3 Of 16/Creating Storage
A steel beam will carry the load of the house over a 16-foot opening in the rear foundation wall. 54 minutes [ Stereo TVG ]
May
Thu, May 5, 12:00 pm · Auburndale Project, Part 4 Of 16/Repairing Rotted
The new walls are framed for the mudroom and powder room. A pest control expert addresses termites. 54 minutes [ Stereo TVG ]
Fri, May 6, 2:07 am · Auburndale Project, Part 4 Of 16/Repairing Rotted
The new walls are framed for the mudroom and powder room. A pest control expert addresses termites. 54 minutes [ Stereo TVG ]
Thu, May 12, 12:00 pm · This Old House Hour
The front entry and framed up kitchen are shown. Prefabricated trusses help make a pitched roof. 56 minutes [ CC Stereo TVG ]
Fri, May 13, 2:00 am · This Old House Hour
The front entry and framed up kitchen are shown. Prefabricated trusses help make a pitched roof. 56 minutes [ CC Stereo TVG ]
Thu, May 19, 12:00 pm · This Old House Hour
The flat roof is framed over the new sunroom and progress is made on the rough plumbing. 54 minutes [ Stereo TVG ]
Fri, May 20, 2:00 am · This Old House Hour
The flat roof is framed over the new sunroom and progress is made on the rough plumbing. 54 minutes [ Stereo TVG ]
Thu, May 26, 12:00 pm · This Old House Hour
A concrete pump truck pours concrete on the basement level including the footings for the new deck. 54 minutes [ Stereo TVG ]
Fri, May 27, 2:00 am · This Old House Hour
A concrete pump truck pours concrete on the basement level including the footings for the new deck. 54 minutes [ Stereo TVG ]
June
Thu, Jun 2, 12:00 pm · This Old House Hour
The ductwork for the hydronic heating and cooling system is installed in the family room ceiling. 54 minutes [ Stereo TVG ]
Fri, Jun 3, 2:00 am · This Old House Hour
The ductwork for the hydronic heating and cooling system is installed in the family room ceiling. 54 minutes [ Stereo TVG ]
Thu, Jun 9, 12:00 pm · This Old House Hour
Chris Kimball of America's Test Kitchen gives his opinion on the final layout of the kitchen design. 54 minutes [ Stereo TVG ]
Fri, Jun 10, 2:00 am · This Old House Hour
Chris Kimball of America's Test Kitchen gives his opinion on the final layout of the kitchen design. 54 minutes [ Stereo TVG ]
Thu, Jun 16, 12:00 pm · This Old House Hour
Arborist Matt Foti removes the Norway maple from the front yard. Kevin takes a Duck Tour in Boston. 54 minutes [ Stereo TVG ]
Fri, Jun 17, 2:00 am · This Old House Hour
Arborist Matt Foti removes the Norway maple from the front yard. Kevin takes a Duck Tour in Boston. 54 minutes [ Stereo TVG ]
Thu, Jun 23, 12:00 pm · This Old House Hour
The footings for the pergola are set. The concrete stoop gets a makeover using fieldstone veneer. 54 minutes [ Stereo TVG ]
Fri, Jun 24, 2:00 am · This Old House Hour
The footings for the pergola are set. The concrete stoop gets a makeover using fieldstone veneer. 54 minutes [ Stereo TVG ]
Thu, Jun 30, 12:00 pm · This Old House Hour
The transformation of the back of the house is almost complete and inside, the painting is underway. 56 minutes [ Stereo TVG ]
July
Fri, Jul 1, 2:00 am · This Old House Hour
The transformation of the back of the house is almost complete and inside, the painting is underway. 56 minutes [ Stereo TVG ]
OPB Plus

previous

July
Fri, Jul 8, 12:00 pm · This Old House Hour
The new pergola is installed in front of the house and a 12-foot tall river birch tree arrives. 56 minutes [ Stereo TVG ]
Fri, Jul 15, 12:00 pm · This Old House Hour
The wood island top, "his & hers" closet systems and wireless security system are installed. 56 minutes [ Stereo TVG ]
Fri, Jul 22, 12:00 pm · This Old House Hour
The exterior low-voltage lighting and the water-saving plumbing fixtures and bath fan are featured. 56 minutes [ Stereo TVG ]
Fri, Jul 29, 12:00 pm · This Old House Hour
A 1933 Spanish Colonial Revival house is expanded and renovated in the Los Angeles area. 56 minutes [ Stereo TVG ]
August
Fri, Aug 5, 12:00 pm · This Old House Hour
A massive foundation form for the new addition is set. Kevin and Norm visit a major movie studio. 56 minutes [ Stereo TVG ]
Fri, Aug 12, 12:00 pm · This Old House Hour
The new clay roof tiles and the historic looking custom windows and doors arrive on the site. 56 minutes [ Stereo TVG ]
Fri, Aug 19, 12:00 pm · This Old House Hour
56 minutes [ Stereo TVG ]
Fri, Aug 26, 12:00 pm · This Old House Hour
Custom foam forms are installed to make a tray ceiling that replicates the house's existing detail. 56 minutes [ Stereo TVG ]
September
Fri, Sep 2, 12:00 pm · This Old House Hour
The last steps of the stucco system go up. Black and yellow tile are installed in the powder room. 56 minutes [ Stereo TVG ]
Fri, Sep 9, 12:00 pm · This Old House Hour
The new terrace is constructed and the crew adds prefabricated decorative corbels made from foam. 56 minutes [ Stereo TVG ]
Fri, Sep 16, 12:00 pm · This Old House Hour
The kitchen cabinets are wrapped in plaster, a look seen in Mexico. The pedestal sink is installed. 56 minutes [ Stereo TVG ]
Fri, Sep 23, 12:00 pm · This Old House Hour
Broken concrete is used for the walkways. A custom garage door and the front gates are installed. 54 minutes [ Stereo TVG ]
Fri, Sep 30, 12:00 pm · This Old House Hour
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 54 minutes [ Stereo TVG ]
October
Fri, Oct 7, 1:00 pm · This Old House Hour
Two additions are built for a historic 300-year-old farmstead, adding space and modern amenities. 56 minutes [ Stereo TVG ]
Fri, Oct 14, 1:00 pm · This Old House Hour
The front entry porch and the accessibility ramp are removed. Excavation begins for a new addition. 53 minutes [ Stereo TVG ]
Fri, Oct 21, 1:00 pm · This Old House Hour
A hole is opened in the old fieldstone foundation to connect the old basement space to the new. 54 minutes [ Stereo TVG ]
Fri, Oct 28, 1:00 pm · This Old House Hour
The floor and walls of the new entry addition are framed up and the exterior chimney is repaired. 54 minutes [ Stereo TVG ]
November
Fri, Nov 4, 1:00 pm · This Old House Hour
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 54 minutes [ Stereo TVG ]
Fri, Nov 11, 1:00 pm · This Old House Hour
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 56 minutes [ Stereo TVG ]
Fri, Nov 18, 1:00 pm · This Old House Hour
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 54 minutes [ Stereo TVG ]
Fri, Nov 25, 1:00 pm · This Old House Hour
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 54 minutes [ Stereo TVG ]
December
Fri, Dec 2, 1:00 pm · This Old House Hour
Tom Silva installs new red cedar clapboards on the oldest part of the house using a story pole. 56 minutes [ Stereo TVG ]
Fri, Dec 9, 1:00 pm · This Old House Hour
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 54 minutes [ Stereo TVG ]
Fri, Dec 16, 1:00 pm · This Old House Hour
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 56 minutes [ Stereo TVG ]
Fri, Dec 23, 1:00 pm · This Old House Hour
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 54 minutes [ Stereo TVG ]
Fri, Dec 30, 1:00 pm · This Old House Hour
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 56 minutes [ Stereo TVG ]
January
Fri, Jan 6, 1:00 pm · This Old House Hour
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 56 minutes [ Stereo TVG ]
Fri, Jan 13, 1:00 pm · This Old House Hour
The final finish is placed on the driveway. An LED strip light is installed at the old fireplace. 53 minutes [ Stereo TVG ]
Fri, Jan 20, 1:00 pm · This Old House Hour
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 56 minutes [ Stereo TVG ]
Fri, Jan 27, 1:00 pm · This Old House Hour
Remodeling begins on a Barrington, Rhode Island home to open up the new space to the water views. 56 minutes [ Stereo TVG ]
February
Fri, Feb 3, 1:00 pm · This Old House Hour
The home's new open floor plan requires structural steel that gets bolted and then welded in place. 56 minutes [ Stereo TVG ]

upcoming

February
Fri, Feb 10, 1:00 pm · This Old House Hour
Windows are installed with a custom copper pan for flashing, a preferred method in coastal areas. 56 minutes [ Stereo TVG ]
Fri, Feb 17, 1:00 pm · This Old House Hour
A hydronic system is integrated with a solar hot water system on the roof for heating and cooling. 56 minutes [ Stereo TVG ]
Fri, Feb 24, 1:00 pm · This Old House Hour
Work begins on a sustainable coastal landscape. The custom copper gutter and scupper are installed. 56 minutes [ Stereo TVG ]
March
Fri, Mar 2, 1:00 pm · This Old House Hour
Garapa, a Brazilian hardwood, is used for the deck and is installed with a hidden fastening system. 56 minutes [ Stereo TVG ]
Fri, Mar 9, 1:00 pm · This Old House Hour
The asphalt is replaced with new concrete pavers in the driveway and wall cabinets are installed. 56 minutes [ Stereo TVG ]

more

March
Fri, Mar 16, 1:00 pm · This Old House Hour
A new retractable awning is installed over the deck and the Saratoga soapstone countertops arrive. 56 minutes [ Stereo TVG ]
Fri, Mar 23, 1:00 pm · This Old House Hour
The insulated steel garage door is up and the cable railing system is finished on the front deck. 56 minutes [ Stereo TVG ]
Fri, Mar 30, 1:00 pm · This Old House Hour
Solar shades are installed on the first floor. The shared master closet and guest room are revealed. 56 minutes [ Stereo TVG ]
April
Fri, Apr 6, 1:00 pm · This Old House Hour
Two additions are built for a historic 300-year-old farmstead, adding space and modern amenities. 56 minutes [ Stereo TVG ]
Fri, Apr 13, 1:00 pm · This Old House Hour
The front entry porch and the accessibility ramp are removed. Excavation begins for a new addition. 56 minutes [ Stereo TVG ]
Fri, Apr 20, 1:00 pm · This Old House Hour
A hole is opened in the old fieldstone foundation to connect the old basement space to the new. 56 minutes [ Stereo TVG ]
Fri, Apr 27, 1:00 pm · This Old House Hour
The floor and walls of the new entry addition are framed up and the exterior chimney is repaired. 56 minutes [ Stereo TVG ]

Note: Only episodes available from 60 days in the past to 60 days in the future are displayed.

Digital Television Help
TONIGHT'S HIGHLIGHTS:

8:00pm Oregon Art Beat
OPB
Paula Fong’s scientific background comes in handy for her art – she loves to paint botanicals and other scenes from nature.

8:30pm Oregon Field Guide
OPB
Field Guide journeys back to the remote, Chetco River almost 10 years after the massive Biscuit fire engulfed the remarkable wilderness river canyon.

9:00pm Doc Martin
OPB : Nowt So Queer
Portwenn is buzzing with the news of the engagement of Dr. Martin and Headmistress Louisa Glasson.

9:46pm Doc Martin
OPB : Happily Ever After
Martin has the dilemma of finding a replacement vicar three hours before his wedding to Louisa.

STATION NEWS:

Become a sponsor