Looking...
A - Z program listing >>
This Old House
Program website: http://www.thisoldhouse.com/toh/
EPISODES
OPB
previous
September
Sat, Sep 24, 5:00 pm ·
Los Angeles Project, Part 6 Of 10
The last steps of the stucco system go up. Black and yellow tile are installed in the powder room. 26 minutes [ Stereo TVG ]
The last steps of the stucco system go up. Black and yellow tile are installed in the powder room. 26 minutes [ Stereo TVG ]
Mon, Sep 26, 6:00 pm ·
Los Angeles Project, Part 7 Of 10
The new terrace is constructed and the crew adds prefabricated decorative corbels made from foam. 26 minutes [ Stereo TVG ]
The new terrace is constructed and the crew adds prefabricated decorative corbels made from foam. 26 minutes [ Stereo TVG ]
October
Sat, Oct 1, 5:00 pm ·
Los Angeles Project, Part 10 Of 10
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 25 minutes [ Stereo TVG ]
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 25 minutes [ Stereo TVG ]
Mon, Oct 3, 6:00 pm ·
Los Angeles Project, Part 10 Of 10
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 25 minutes [ Stereo TVG ]
The bathroom fan system, HVAC system and "cake frosting" plaster detail on the walls are featured. 25 minutes [ Stereo TVG ]
Sat, Oct 8, 5:00 pm ·
Bedford Project - Part 1 Of 16
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 26 minutes [ Stereo TVG ]
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 26 minutes [ Stereo TVG ]
Mon, Oct 10, 6:00 pm ·
Bedford Project - Part 1 Of 16
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Sat, Oct 15, 5:00 pm ·
Bedford Project - Part 2 Of 16
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
Mon, Oct 17, 6:00 pm ·
Bedford Project - Part 2 Of 16
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
Sat, Oct 22, 5:00 pm ·
Bedford Project - Part 3 Of 16
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
Mon, Oct 24, 6:00 pm ·
Bedford Project - Part 3 Of 16
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
Sat, Oct 29, 5:00 pm ·
Bedford Project - Part 4 Of 16
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
Mon, Oct 31, 6:00 pm ·
Bedford Project - Part 4 Of 16
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
November
Sat, Nov 5, 5:00 pm ·
Bedford Project, Part 5 Of 16
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
Mon, Nov 7, 6:00 pm ·
Bedford Project, Part 5 Of 16
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
Sat, Nov 12, 5:00 pm ·
Bedford Project, Part 6 Of 16
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
Mon, Nov 14, 6:00 pm ·
Bedford Project, Part 6 Of 16
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
Sat, Nov 19, 5:00 pm ·
Bedford Project, Part 7 Of 16
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Mon, Nov 21, 6:00 pm ·
Bedford Project, Part 7 Of 16
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Sat, Nov 26, 5:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
Mon, Nov 28, 6:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
December
Sat, Dec 3, 5:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
Mon, Dec 5, 6:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
Sat, Dec 24, 5:00 pm ·
Bedford Project, Part 10 Of 16
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 26 minutes [ Stereo TVG ]
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 26 minutes [ Stereo TVG ]
Mon, Dec 26, 6:00 pm ·
Bedford Project, Part 10 Of 16
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 26 minutes [ Stereo TVG ]
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 26 minutes [ Stereo TVG ]
Sat, Dec 31, 5:00 pm ·
Bedford Project, Part 11 Of 16
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 25 minutes [ Stereo TVG ]
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 25 minutes [ Stereo TVG ]
January
Mon, Jan 2, 6:00 pm ·
Bedford Project, Part 11 Of 16
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 25 minutes [ Stereo TVG ]
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 25 minutes [ Stereo TVG ]
Sat, Jan 7, 5:00 pm ·
Bedford Project, Part 12 Of 16
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Mon, Jan 9, 6:00 pm ·
Bedford Project, Part 12 Of 16
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Sat, Jan 14, 5:00 pm ·
Bedford Project, Part 13 Of 16
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Mon, Jan 16, 6:00 pm ·
Bedford Project, Part 13 Of 16
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Sat, Jan 21, 5:00 pm ·
Bedford Project, Part 14 Of 16
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 26 minutes [ Stereo TVG ]
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 26 minutes [ Stereo TVG ]
Mon, Jan 23, 6:00 pm ·
Bedford Project, Part 14 Of 16
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 26 minutes [ Stereo TVG ]
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 26 minutes [ Stereo TVG ]
Sat, Jan 28, 5:00 pm ·
Bedford Project, Part 15 Of 16
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
Mon, Jan 30, 6:00 pm ·
Bedford Project, Part 15 Of 16
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
February
Sat, Feb 4, 5:00 pm ·
Bedford Project, Part 16 Of 16
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Mon, Feb 6, 6:00 pm ·
Bedford Project, Part 16 Of 16
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Sat, Feb 11, 5:00 pm ·
Barrington Project, Part 1 Of 10
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 26 minutes [ Stereo TVG ]
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 26 minutes [ Stereo TVG ]
Mon, Feb 13, 6:00 pm ·
Barrington Project, Part 1 Of 10
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 26 minutes [ Stereo TVG ]
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 26 minutes [ Stereo TVG ]
Sat, Feb 18, 5:00 pm ·
Barrington Project, Part 2 Of 10
The home's new open floor plan requires structural steel that gets bolted and then welded in place. 26 minutes [ Stereo TVG ]
The home's new open floor plan requires structural steel that gets bolted and then welded in place. 26 minutes [ Stereo TVG ]
Mon, Feb 20, 6:00 pm ·
Barrington Project, Part 2 Of 10
The home's new open floor plan requires structural steel that gets bolted and then welded in place. 26 minutes [ Stereo TVG ]
The home's new open floor plan requires structural steel that gets bolted and then welded in place. 26 minutes [ Stereo TVG ]
Sat, Feb 25, 5:00 pm ·
Barrington Project, Part 3 Of 10
Windows are installed using a copper pan for flashing, a preferred method in coastal situations. 26 minutes [ Stereo TVG ]
Windows are installed using a copper pan for flashing, a preferred method in coastal situations. 26 minutes [ Stereo TVG ]
Mon, Feb 27, 6:00 pm ·
Barrington Project, Part 3 Of 10
Windows are installed using a copper pan for flashing, a preferred method in coastal situations. 26 minutes [ Stereo TVG ]
Windows are installed using a copper pan for flashing, a preferred method in coastal situations. 26 minutes [ Stereo TVG ]
March
Mon, Mar 5, 6:00 pm ·
Barrington Project, Part 4 Of 10
A hydronic system is integrated with a solar hot water system on the roof for heating and cooling. 26 minutes [ Stereo TVG ]
A hydronic system is integrated with a solar hot water system on the roof for heating and cooling. 26 minutes [ Stereo TVG ]
Mon, Mar 12, 6:00 pm ·
Barrington Project, Part 5 Of 10
Work begins on a sustainable coastal landscape. The custom copper gutter and scupper are installed. 26 minutes [ Stereo TVG ]
Work begins on a sustainable coastal landscape. The custom copper gutter and scupper are installed. 26 minutes [ Stereo TVG ]
Mon, Mar 19, 6:00 pm ·
Barrington Project, Part 6 Of 10
Garapa, a Brazilian hardwood, is used for the deck and is installed with a hidden fastening system. 26 minutes [ Stereo TVG ]
Garapa, a Brazilian hardwood, is used for the deck and is installed with a hidden fastening system. 26 minutes [ Stereo TVG ]
Sat, Mar 24, 5:00 pm ·
Barrington Project, Part 5 Of 10
Work begins on a sustainable coastal landscape. The custom copper gutter and scupper are installed. 26 minutes [ Stereo TVG ]
Work begins on a sustainable coastal landscape. The custom copper gutter and scupper are installed. 26 minutes [ Stereo TVG ]
Mon, Mar 26, 6:00 pm ·
Barrington Project, Part 7 Of 10
The asphalt is replaced with new concrete pavers in the driveway and wall cabinets are installed. 26 minutes [ Stereo TVG ]
The asphalt is replaced with new concrete pavers in the driveway and wall cabinets are installed. 26 minutes [ Stereo TVG ]
Sat, Mar 31, 5:00 pm ·
Barrington Project, Part 6 Of 10
Garapa, a Brazilian hardwood, is used for the deck and is installed with a hidden fastening system. 26 minutes [ Stereo TVG ]
Garapa, a Brazilian hardwood, is used for the deck and is installed with a hidden fastening system. 26 minutes [ Stereo TVG ]
April
Mon, Apr 2, 6:00 pm ·
Barrington Project, Part 8 Of 10
A new retractable awning is installed over the deck and the Saratoga soapstone countertops arrive. 25 minutes [ Stereo TVG ]
A new retractable awning is installed over the deck and the Saratoga soapstone countertops arrive. 25 minutes [ Stereo TVG ]
Sat, Apr 7, 5:00 pm ·
Barrington Project, Part 7 Of 10
The asphalt is replaced with new concrete pavers in the driveway and wall cabinets are installed. 25 minutes [ Stereo TVG ]
The asphalt is replaced with new concrete pavers in the driveway and wall cabinets are installed. 25 minutes [ Stereo TVG ]
Mon, Apr 9, 6:00 pm ·
Barrington Project, Part 9 Of 10
The insulated steel garage door is up and the cable railing system is finished on the front deck. 25 minutes [ Stereo TVG ]
The insulated steel garage door is up and the cable railing system is finished on the front deck. 25 minutes [ Stereo TVG ]
Sat, Apr 14, 5:00 pm ·
Barrington Project, Part 8 Of 10
A new retractable awning is installed over the deck and the Saratoga soapstone countertops arrive. 25 minutes [ Stereo TVG ]
A new retractable awning is installed over the deck and the Saratoga soapstone countertops arrive. 25 minutes [ Stereo TVG ]
Mon, Apr 16, 6:00 pm ·
Barrington Project, Part 10 Of 10
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Sat, Apr 21, 5:00 pm ·
Barrington Project, Part 9 Of 10
The insulated steel garage door is up and the cable railing system is finished on the front deck. 25 minutes [ Stereo TVG ]
The insulated steel garage door is up and the cable railing system is finished on the front deck. 25 minutes [ Stereo TVG ]
Sat, Apr 28, 5:00 pm ·
Barrington Project, Part 10 Of 10
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Mon, Apr 30, 6:00 pm ·
Barrington Project, Part 10 Of 10
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
May
Sat, May 5, 5:00 pm ·
Bedford Project - Part 1 Of 16
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Mon, May 7, 6:00 pm ·
Bedford Project - Part 1 Of 16
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Space and modern amenities with two small additions are added to a historic 300-year-old farmstead. 25 minutes [ Stereo TVG ]
Sat, May 12, 5:00 pm ·
Bedford Project - Part 2 Of 16
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
Mon, May 14, 6:00 pm ·
Bedford Project - Part 2 Of 16
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
The porch is removed near the oldest part of the house and excavation begins on the new addition. 26 minutes [ Stereo TVG ]
Sat, May 19, 5:00 pm ·
Bedford Project - Part 3 Of 16
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
Mon, May 21, 6:00 pm ·
Bedford Project - Part 3 Of 16
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
The footprint of the addition takes shape as Tom Silva forms the new foundation out of ICFs. 26 minutes [ Stereo TVG ]
Sat, May 26, 5:00 pm ·
Bedford Project - Part 4 Of 16
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
Mon, May 28, 6:00 pm ·
Bedford Project - Part 4 Of 16
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
The floor and walls of the entry addition is framed up and the connection to the house is created. 26 minutes [ Stereo TVG ]
June
Sat, Jun 2, 5:00 pm ·
Bedford Project, Part 5 Of 16
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
Mon, Jun 4, 6:00 pm ·
Bedford Project, Part 5 Of 16
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
The gable wall is raised for the new family room addition and a historic windowsill is repaired. 26 minutes [ Stereo TVG ]
Sat, Jun 23, 5:00 pm ·
Bedford Project, Part 6 Of 16
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
Mon, Jun 25, 6:00 pm ·
Bedford Project, Part 6 Of 16
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
A new addition is sheathed with a coated OSB product that has properties of a house wrap built in. 26 minutes [ Stereo TVG ]
Sat, Jun 30, 5:00 pm ·
Bedford Project, Part 7 Of 16
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
July
Mon, Jul 2, 6:00 pm ·
Bedford Project, Part 7 Of 16
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Tom Silva tops off the existing cellulose insulation in the walls of the oldest part of the house. 26 minutes [ Stereo TVG ]
Sat, Jul 7, 5:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
Mon, Jul 9, 6:00 pm ·
Bedford Project, Part 8 Of 16
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
A partially rotted old post in the kitchen is replaced. The historic window sashes are reinstalled. 26 minutes [ Stereo TVG ]
Sat, Jul 14, 5:00 pm ·
Bedford Project, Part 9 Of 16
Tom Silva installs new red cedar clapboards on the oldest part of the house using a story pole. 26 minutes [ Stereo TVG ]
Tom Silva installs new red cedar clapboards on the oldest part of the house using a story pole. 26 minutes [ Stereo TVG ]
Mon, Jul 16, 6:00 pm ·
Bedford Project, Part 9 Of 16
Tom Silva installs new red cedar clapboards on the oldest part of the house using a story pole. 26 minutes [ Stereo TVG ]
Tom Silva installs new red cedar clapboards on the oldest part of the house using a story pole. 26 minutes [ Stereo TVG ]
Sat, Jul 21, 5:00 pm ·
Bedford Project, Part 10 Of 16
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 25 minutes [ Stereo TVG ]
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 25 minutes [ Stereo TVG ]
Mon, Jul 23, 6:00 pm ·
Bedford Project, Part 10 Of 16
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 25 minutes [ Stereo TVG ]
Norm Abram and Tom Silva rebuild the front door surround to create a more attractive entranceway. 25 minutes [ Stereo TVG ]
Sat, Jul 28, 5:00 pm ·
Bedford Project, Part 11 Of 16
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 26 minutes [ Stereo TVG ]
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 26 minutes [ Stereo TVG ]
Mon, Jul 30, 6:00 pm ·
Bedford Project, Part 11 Of 16
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 26 minutes [ Stereo TVG ]
Landscape contractor Roger Cook installs a 3,000-pound slab of reclaimed granite for the front step. 26 minutes [ Stereo TVG ]
August
Sat, Aug 4, 5:00 pm ·
Bedford Project, Part 12 Of 16
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Mon, Aug 6, 6:00 pm ·
Bedford Project, Part 12 Of 16
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Tom Silva and Norm Abram install the massive decorative timbers in the new family room. 26 minutes [ Stereo TVG ]
Sat, Aug 11, 5:00 pm ·
Bedford Project, Part 13 Of 16
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Mon, Aug 13, 6:00 pm ·
Bedford Project, Part 13 Of 16
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Old-style bricks made in Massachusetts are used to create a winding path to the new entry door. 26 minutes [ Stereo TVG ]
Sat, Aug 18, 5:00 pm ·
Bedford Project, Part 14 Of 16
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 25 minutes [ Stereo TVG ]
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 25 minutes [ Stereo TVG ]
Mon, Aug 20, 6:00 pm ·
Bedford Project, Part 14 Of 16
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 25 minutes [ Stereo TVG ]
Tom Silva restores the circa 1720 raised panel front door with flexible epoxy and a new paint job. 25 minutes [ Stereo TVG ]
Sat, Aug 25, 5:00 pm ·
Bedford Project, Part 15 Of 16
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
The final finish is placed on the driveway. A new LED strip light is installed at the old fireplace 26 minutes [ Stereo TVG ]
September
Sat, Sep 1, 5:00 pm ·
Bedford Project, Part 16 Of 16
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Mon, Sep 3, 6:00 pm ·
Bedford Project, Part 16 Of 16
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Ceramic backsplash tile is installed in the kitchen and a doorknocker is added to the front door. 26 minutes [ Stereo TVG ]
Sat, Sep 8, 5:00 pm ·
Barrington Project, Part 1 Of 10
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 25 minutes [ Stereo TVG ]
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 25 minutes [ Stereo TVG ]
Mon, Sep 10, 6:00 pm ·
Barrington Project, Part 1 Of 10
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 25 minutes [ Stereo TVG ]
Work begins on a Rhode Island beach home by removing everything that is outdated in the kitchen. 25 minutes [ Stereo TVG ]
Sat, Sep 29, 5:00 pm ·
Barrington Project, Part 10 Of 10
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
October
Mon, Oct 1, 6:00 pm ·
Barrington Project, Part 10 Of 10
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Solar shades are installed on the first floor. Erin Hardy shows Kevin the shared master closet. 25 minutes [ Stereo TVG ]
Sat, Oct 6, 5:00 pm ·
Cambridge Project, Part 1 Of 15
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 26 minutes [ Stereo TVG ]
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 26 minutes [ Stereo TVG ]
Mon, Oct 8, 6:00 pm ·
Cambridge Project, Part 1 Of 15
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Sat, Oct 13, 5:00 pm ·
Cambridge Project, Part 2 Of 15
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 26 minutes [ Stereo TVG ]
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 26 minutes [ Stereo TVG ]
Mon, Oct 15, 6:00 pm ·
Cambridge Project, Part 2 Of 15
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
Sat, Oct 20, 5:00 pm ·
Cambridge Project, Part 3 Of 15
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 26 minutes [ Stereo TVG ]
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 26 minutes [ Stereo TVG ]
Sat, Oct 27, 5:00 pm ·
Cambridge Project, Part 4 Of 15
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 26 minutes [ Stereo TVG ]
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 26 minutes [ Stereo TVG ]
Mon, Oct 29, 6:00 pm ·
Cambridge Project, Part 4 Of 15
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
November
Sat, Nov 3, 5:00 pm ·
Getting Around In Cambridge
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 26 minutes [ Stereo TVG ]
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 26 minutes [ Stereo TVG ]
Mon, Nov 5, 6:00 pm ·
Getting Around In Cambridge
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
Sat, Nov 10, 5:00 pm ·
Exterior Improvements
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 26 minutes [ Stereo TVG ]
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 26 minutes [ Stereo TVG ]
Mon, Nov 12, 6:00 pm ·
Exterior Improvements
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Sat, Nov 17, 5:00 pm ·
Old And New In Harmony
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 26 minutes [ Stereo TVG ]
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 26 minutes [ Stereo TVG ]
Mon, Nov 19, 6:00 pm ·
Old And New In Harmony
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
Sat, Nov 24, 5:00 pm ·
Melting Pot
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 26 minutes [ Stereo TVG ]
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 26 minutes [ Stereo TVG ]
Mon, Nov 26, 6:00 pm ·
Melting Pot
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
December
Sat, Dec 1, 5:00 pm ·
Cambridge 2012/Hot Stuff
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 26 minutes [ Stereo TVG ]
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 26 minutes [ Stereo TVG ]
Mon, Dec 3, 6:00 pm ·
Cambridge 2012/Hot Stuff
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
Sat, Dec 22, 5:00 pm ·
Cambridge 2012/Swedish Details
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Mon, Dec 24, 6:00 pm ·
Cambridge 2012/Swedish Details
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Sat, Dec 29, 5:00 pm ·
Cambridge 2012/Window Seat, Stairs, Knee Walls
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
Mon, Dec 31, 6:00 pm ·
Cambridge 2012/Window Seat, Stairs, Knee Walls
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
January
Sat, Jan 5, 5:00 pm ·
Cambridge 2012/Rounding The Corner
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Mon, Jan 7, 6:00 pm ·
Cambridge 2012/Rounding The Corner
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Sat, Jan 12, 5:00 pm ·
Cambridge 2012/Hearthstone, Waterfall Island Top
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Mon, Jan 14, 6:00 pm ·
Cambridge 2012/Hearthstone, Waterfall Island Top
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Sat, Jan 19, 5:00 pm ·
Cambridge 2012, Secondary Spaces
The driveway, walk-in closets, home automation and the wallpaper in the powder room are showcased. 25 minutes [ Stereo TVG ]
The driveway, walk-in closets, home automation and the wallpaper in the powder room are showcased. 25 minutes [ Stereo TVG ]
Mon, Jan 21, 6:00 pm ·
Cambridge 2012, Secondary Spaces
The driveway, walk-in closets, home automation and the wallpaper in the powder room are showcased. 25 minutes [ Stereo TVG ]
The driveway, walk-in closets, home automation and the wallpaper in the powder room are showcased. 25 minutes [ Stereo TVG ]
Sat, Jan 26, 5:00 pm ·
Cambridge 2012, The Big Finish
Granite posts set off the landscape and the revived vintage doorbell crowns the foyer in Cambridge. 25 minutes [ Stereo TVG ]
Granite posts set off the landscape and the revived vintage doorbell crowns the foyer in Cambridge. 25 minutes [ Stereo TVG ]
Mon, Jan 28, 6:00 pm ·
Cambridge 2012, The Big Finish
Granite posts set off the landscape and the revived vintage doorbell crowns the foyer in Cambridge. 25 minutes [ Stereo TVG ]
Granite posts set off the landscape and the revived vintage doorbell crowns the foyer in Cambridge. 25 minutes [ Stereo TVG ]
February
Sat, Feb 2, 5:00 pm ·
Essex 2012/13, A Cottage In The Wood
Work begins turning a 1935 English-style cottage into an accessible in-law home for aging parents. 25 minutes [ Stereo TVG ]
Work begins turning a 1935 English-style cottage into an accessible in-law home for aging parents. 25 minutes [ Stereo TVG ]
Mon, Feb 4, 6:00 pm ·
Essex 2012/13, A Cottage In The Wood
Work begins turning a 1935 English-style cottage into an accessible in-law home for aging parents. 25 minutes [ Stereo TVG ]
Work begins turning a 1935 English-style cottage into an accessible in-law home for aging parents. 25 minutes [ Stereo TVG ]
Sat, Feb 9, 5:00 pm ·
Essex 2012/13, Human Centered Design, And Demo
The bad shed dormer is removed at the project house and work starts on a barrier-free entry. 25 minutes [ Stereo TVG ]
The bad shed dormer is removed at the project house and work starts on a barrier-free entry. 25 minutes [ Stereo TVG ]
Mon, Feb 11, 6:00 pm ·
Essex 2012/13, Human Centered Design, And Demo
The bad shed dormer is removed at the project house and work starts on a barrier-free entry. 25 minutes [ Stereo TVG ]
The bad shed dormer is removed at the project house and work starts on a barrier-free entry. 25 minutes [ Stereo TVG ]
Sat, Feb 16, 5:00 pm ·
Essex 2012/13, One-Level Living
Correct flashing and water table techniques keep water out of a house and preserves a level grade. 25 minutes [ Stereo TVG ]
Correct flashing and water table techniques keep water out of a house and preserves a level grade. 25 minutes [ Stereo TVG ]
Mon, Feb 18, 6:00 pm ·
Essex 2012/13, One-Level Living
Correct flashing and water table techniques keep water out of a house and preserves a level grade. 25 minutes [ Stereo TVG ]
Correct flashing and water table techniques keep water out of a house and preserves a level grade. 25 minutes [ Stereo TVG ]
Sat, Feb 23, 5:00 pm ·
Essex 2012/13, Liquid Assets
Roger Cook helps aquatic systems specialist Yorgos Gregory revive a neglected water feature. 25 minutes [ Stereo TVG ]
Roger Cook helps aquatic systems specialist Yorgos Gregory revive a neglected water feature. 25 minutes [ Stereo TVG ]
Mon, Feb 25, 6:00 pm ·
Essex 2012/13, Liquid Assets
Roger Cook helps aquatic systems specialist Yorgos Gregory revive a neglected water feature. 25 minutes [ Stereo TVG ]
Roger Cook helps aquatic systems specialist Yorgos Gregory revive a neglected water feature. 25 minutes [ Stereo TVG ]
March
Sat, Mar 2, 5:00 pm ·
Essex 2012/13, Cottage Style
Geothermal bore holes are filled and shingles are weaved around a corner for a cottage look. 25 minutes [ Stereo TVG ]
Geothermal bore holes are filled and shingles are weaved around a corner for a cottage look. 25 minutes [ Stereo TVG ]
Mon, Mar 4, 6:00 pm ·
Essex 2012/13, Cottage Style
Geothermal bore holes are filled and shingles are weaved around a corner for a cottage look. 25 minutes [ Stereo TVG ]
Geothermal bore holes are filled and shingles are weaved around a corner for a cottage look. 25 minutes [ Stereo TVG ]
Sat, Mar 23, 5:00 pm ·
Essex 2012/13, Clam Flats & Lightning Rods
The barrier-free walk that leads to the house is finished using granite and bluestone but no steps. 25 minutes [ Stereo TVG ]
The barrier-free walk that leads to the house is finished using granite and bluestone but no steps. 25 minutes [ Stereo TVG ]
Mon, Mar 25, 6:00 pm ·
Essex 2012/13, Clam Flats & Lightning Rods
The barrier-free walk that leads to the house is finished using granite and bluestone but no steps. 25 minutes [ Stereo TVG ]
The barrier-free walk that leads to the house is finished using granite and bluestone but no steps. 25 minutes [ Stereo TVG ]
Sat, Mar 30, 5:00 pm ·
Essex 2012/13, Rustic Plaster, Advanced Septic
Wallboard installer Brian Jones shows how he uses a panel lift to install ceilings singlehandedly. 25 minutes [ Stereo TVG ]
Wallboard installer Brian Jones shows how he uses a panel lift to install ceilings singlehandedly. 25 minutes [ Stereo TVG ]
April
Mon, Apr 1, 6:00 pm ·
Essex 2012/13, Rustic Plaster, Advanced Septic
Wallboard installer Brian Jones shows how he uses a panel lift to install ceilings singlehandedly. 25 minutes [ Stereo TVG ]
Wallboard installer Brian Jones shows how he uses a panel lift to install ceilings singlehandedly. 25 minutes [ Stereo TVG ]
Sat, Apr 6, 5:00 pm ·
Essex 2012/13, Wooden Ships & Shiplap Boards
Norm Abram visits Essex's last shipyard and Tom Silva builds shiplap barn board walls and a mantel. 25 minutes [ Stereo TVG ]
Norm Abram visits Essex's last shipyard and Tom Silva builds shiplap barn board walls and a mantel. 25 minutes [ Stereo TVG ]
Mon, Apr 8, 6:00 pm ·
Essex 2012/13, Wooden Ships & Shiplap Boards
Norm Abram visits Essex's last shipyard and Tom Silva builds shiplap barn board walls and a mantel. 25 minutes [ Stereo TVG ]
Norm Abram visits Essex's last shipyard and Tom Silva builds shiplap barn board walls and a mantel. 25 minutes [ Stereo TVG ]
Sat, Apr 13, 5:00 pm ·
Essex 2012/13, From Our House To Daryl's House
Salvaged hearth tile and stained quarter-sawn oak floors revive the look of the original cottage. 25 minutes [ Stereo TVG ]
Salvaged hearth tile and stained quarter-sawn oak floors revive the look of the original cottage. 25 minutes [ Stereo TVG ]
Mon, Apr 15, 6:00 pm ·
Essex 2012/13, From Our House To Daryl's House
Salvaged hearth tile and stained quarter-sawn oak floors revive the look of the original cottage. 25 minutes [ Stereo TVG ]
Salvaged hearth tile and stained quarter-sawn oak floors revive the look of the original cottage. 25 minutes [ Stereo TVG ]
Sat, Apr 20, 5:00 pm ·
Essex 2012/13, Design For Everyone
Reclaimed marble tile in the foyer and hand painted border tile in the kitchen are installed. 25 minutes [ Stereo TVG ]
Reclaimed marble tile in the foyer and hand painted border tile in the kitchen are installed. 25 minutes [ Stereo TVG ]
Mon, Apr 22, 6:00 pm ·
Essex 2012/13, Design For Everyone
Reclaimed marble tile in the foyer and hand painted border tile in the kitchen are installed. 25 minutes [ Stereo TVG ]
Reclaimed marble tile in the foyer and hand painted border tile in the kitchen are installed. 25 minutes [ Stereo TVG ]
Sat, Apr 27, 5:00 pm ·
Essex 2012/13, A Home For Mom & Dad
Interior designer Keith Musinski gives a grand tour of the beautifully decorated "English cottage." 25 minutes [ Stereo TVG ]
Interior designer Keith Musinski gives a grand tour of the beautifully decorated "English cottage." 25 minutes [ Stereo TVG ]
Mon, Apr 29, 6:00 pm ·
Essex 2012/13, A Home For Mom & Dad
Interior designer Keith Musinski gives a grand tour of the beautifully decorated "English cottage." 25 minutes [ Stereo TVG ]
Interior designer Keith Musinski gives a grand tour of the beautifully decorated "English cottage." 25 minutes [ Stereo TVG ]
May
Sat, May 4, 5:00 pm ·
Cambridge Project, Part 1 Of 15
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Mon, May 6, 6:00 pm ·
Cambridge Project, Part 1 Of 15
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Work begins turning an 1887 Victorian-era two family house in Massachusetts into a one-family home. 25 minutes [ Stereo TVG ]
Sat, May 11, 5:00 pm ·
Cambridge Project, Part 2 Of 15
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
Mon, May 13, 6:00 pm ·
Cambridge Project, Part 2 Of 15
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
The crew removes a central chimney brick-by-brick and Roger Cook removes a sick Norway maple. 25 minutes [ Stereo TVG ]
upcoming
May
Sat, May 18, 5:00 pm ·
Cambridge Project, Part 3 Of 15
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 25 minutes [ Stereo TVG ]
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 25 minutes [ Stereo TVG ]
Mon, May 20, 6:00 pm ·
Cambridge Project, Part 3 Of 15
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 25 minutes [ Stereo TVG ]
With the interior opened up, Norm Abram shows host Kevin O'Connor the bones of the building. 25 minutes [ Stereo TVG ]
Sat, May 25, 5:00 pm ·
Cambridge Project, Part 4 Of 15
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
Mon, May 27, 6:00 pm ·
Cambridge Project, Part 4 Of 15
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
The crew starts the ceiling work on the first floor and a skylight is built in the master suite. 25 minutes [ Stereo TVG ]
June
Sat, Jun 15, 5:00 pm ·
Getting Around In Cambridge
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
more
June
Mon, Jun 17, 6:00 pm ·
Getting Around In Cambridge
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
The steps to the roof deck and the giant stump left over from the old Norway maple are removed. 25 minutes [ Stereo TVG ]
Sat, Jun 22, 5:00 pm ·
Exterior Improvements
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Mon, Jun 24, 6:00 pm ·
Exterior Improvements
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Mason Mark McCullough repoints the old brick foundation and the sagging front porch is repaired. 25 minutes [ Stereo TVG ]
Sat, Jun 29, 5:00 pm ·
Old And New In Harmony
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
July
Mon, Jul 1, 6:00 pm ·
Old And New In Harmony
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
The concrete front walk is replaced with a new bluestone design. Replacement windows are installed. 25 minutes [ Stereo TVG ]
Sat, Jul 6, 5:00 pm ·
Melting Pot
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
Mon, Jul 8, 6:00 pm ·
Melting Pot
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
The exterior trim details are matched and a staggered shingle pattern on the half walls is created. 25 minutes [ Stereo TVG ]
Sat, Jul 13, 5:00 pm ·
Cambridge 2012/Hot Stuff
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
Mon, Jul 15, 6:00 pm ·
Cambridge 2012/Hot Stuff
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
The painters spray the house a sunny yellow and a Danish wood-burning fireplace is installed. 25 minutes [ Stereo TVG ]
Sat, Jul 20, 5:00 pm ·
Cambridge 2012/Swedish Details
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Mon, Jul 22, 6:00 pm ·
Cambridge 2012/Swedish Details
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Southern yellow pine board accents are installed and the roof deck gets PVC porch boards. 25 minutes [ Stereo TVG ]
Sat, Jul 27, 5:00 pm ·
Cambridge 2012/Window Seat, Stairs, Knee Walls
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
Mon, Jul 29, 6:00 pm ·
Cambridge 2012/Window Seat, Stairs, Knee Walls
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
New granite steps, a timeless window seat and some MDF doors disguised as wainscoting are featured. 25 minutes [ Stereo TVG ]
August
Sat, Aug 3, 5:00 pm ·
Cambridge 2012/Rounding The Corner
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Mon, Aug 5, 6:00 pm ·
Cambridge 2012/Rounding The Corner
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Plastic drywells that will keep the yard from flooding and sleek kitchen cabinets are installed. 25 minutes [ Stereo TVG ]
Sat, Aug 10, 5:00 pm ·
Cambridge 2012/Hearthstone, Waterfall Island Top
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Mon, Aug 12, 6:00 pm ·
Cambridge 2012/Hearthstone, Waterfall Island Top
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Roger is getting the plants in despite the rain and Richard installs wall-mounted lavatory faucets. 25 minutes [ Stereo TVG ]
Note: Only episodes available from 60 days in the past to 60 days in the future are displayed.
TONIGHT'S HIGHLIGHTS:
8:00pm Nature
OPB : Great Zebra Exodus
Over 20,000 zebras make their epic migration across the Kalahari's Makgadikgadi Pans in Africa.
OPB : Great Zebra Exodus
Over 20,000 zebras make their epic migration across the Kalahari's Makgadikgadi Pans in Africa.
9:00pm NOVA
OPB : Decoding Neanderthals
Geneticists explore what happened when the first humans encountered Neanderthals 60,000 years ago.
OPB : Decoding Neanderthals
Geneticists explore what happened when the first humans encountered Neanderthals 60,000 years ago.
STATION NEWS:


