Culture8-hour shifts, 8-minute bridge lifts: ‘At Work With’ Portland bridge tendersBy Lillian Karabaic (OPB)March 2, 2024 2 p.m.“It’ll be open as soon as we can. The average lift is eight minutes,” said Multnomah County Bridge Operator Dave Hanemann📨 Daily news in your inboxSign up today for OPB’s “First Look” – your daily guide to the most important news and culture stories from around the Northwest.EmailPlease leave this field blankSign up